Capacity Load by Site
Two plants run hot (Kestrel Park 94%, Cedar Forge 91%) while Brightfield sits at 64% — the relief valve for rebalancing without overtime.
Back to module
Hottest site
94%
Kestrel Park
Network utilization
84%
+2%2 sites > 90%
Relief capacity
64%
Brightfield
Capacity load by site
Projected line load vs available (peak season)
AI narrative
Why this matters
Kestrel Park (outdoor-equipment fab) and Cedar Forge (flagship assembly) are the binding constraints; Cedar Forge is projected to breach 100% in Wk32-36. Brightfield at 64% absorbs the overflow. Rebalancing ~1,800 units of Home Appliances to Harlow Bend resolves the peak overload without overtime and protects ~$4.8M of revenue.
Site load detail
Utilization, service and overtime by plant
SiteLoad %ServiceOvertime
Kestrel Park94%96.1%15.6%
Cedar Forge91%98.2%12.4%
Ironvale88%97.5%9.8%
Copperline86%97.2%11.8%
Harlow Bend83%97.8%8.4%
Saltmarsh Works79%96.9%7.1%
Maple Hollow72%98.4%5.2%
Brightfield64%95.8%6.1%